🌏 Blogs / Articles / News / Classifieds / Press Releases / PSA / Podcast / Poetry / Storytelling

 

Putzmeister 42M Concrete Boom Pump

Our own number: 723

  1. Re-manufactured Putzmeister 42 meters concrete pump, Volvo chassis, 4RZ boom form with x-leg. First-level standard maintenance. High working stability.
  2. Approximate to New putzmeister used pumps standard.

 

Model

Whole machine profile

Condition

Remanufactured

Model

Putzmeister 42M

S.N.

 

Brand

Putzmeister

Manufacture Year and Month

June of 2005

Boom Length (M)

42

Chassis

Volvo

Pumping Volume(cbm)

 

 

Mileage(km)

 

Pumping system

Max. Theorem. output (High pressure/low pressure)(m3/h)

140/88

Max. Theorem. concrete output Pressure (High pressure/low pressure)(Mpa)

13/8.5

Rated working pressure

36

Pumping frequency (High pressure/low pressure)(min-1)

15/27

Hopper capacity (L)

600

Filling height (mm)

1350

Hydraulic system type

Open loop

Distribution vavle

S valve

Oil cylinder diameter.×stroke (mm)

Φ80×2100

Concrete cylinder diameter.×stroke (mm)

Φ230×2100

Hydraulic oil cooling

Air cooling

Reconmended concrete slump(cm)

12~23

Max. agreegate dimension (mm)

40

Boom section

Structure type

42-4RZ

Placing depth(m)

41.9

Max. horizontal distance(m)

37.9

Max. placing depth(m)

30.7

Slewing angle

360°

Pipe diameter(mm)

125

End hose length(mm)

4000

Min. height of oping placing boom(mm)

 

outriggers span(front×rear×side)(mm)

 

Chasiss $ Pump unit

Chassis No.

Volvo 380

Wheelbase(mm)

 

Engine No.

ISDE270-40

Engine power rating(kW)

279

Emission standard

Euro Ⅲ

Demension(Length×width×height)(mm)

12981x2490x3867

Others

lubricating system

Manual hydraulic lubrication pump dual-use synchronization

Hydraulic fuel tank capacity(L)

500

Control system

Manual+remote control

Max. pressure of Pressure water tank (Mpa)

2.5

Water tank capacity(L)

650

Concrete pipe cleaning mode

Water cleaning

 

Safety issues should be paid attention to in the construction of putzmeister used putzmeister pump

Keep the water tank full of clean water, and check and deal with it in time when finding the water quality is cloudy and there are many sand grains.

Bolts of the putzmeister 42 shall be fastened, pipe joints shall be tightly sealed, and protective devices shall be complete and reliable.

The control, high-speed handle, handwheel, control lever and cock shall be in the correct position. The hydraulic system should be normal and free of leakage.

When the pumping system is under pressure, it shall not open any delivery pipe or hydraulic pipe. The safety valve of the hydraulic system shall not be adjusted arbitrarily, and the accumulator can only be filled with nitrogen.

After the operation of concrete tow pumps, all the commercial concrete in the hopper and pipeline must be exported, and then the putzmeister concrete pump truck, hopper and pipes shall be cleaned. When rinsing the pipe with compressed air, no one can stand within 10 meters in front of the outlet end of the pipe, and the foam rubber and sand particles rushed out should be collected by metal net basket.

It is strictly forbidden to flush the pipe of the placing boom with compressed air. The folding and shrinking of the placing boom should be done in order.8466529097?profile=original8466623690?profile=original

Votes: 0
E-mail me when people leave their comments –

You need to be a member of Hey Papi Promotions Network to add comments!

Join Hey Papi Promotions Network

🔥Christian Music News