peiyangchem's Posts (7)

Sort by

Mini Oil Refinery

Catalog of Mini mobile Oil Refinery

Mode

Capacity

(BPD)

Power

(Kw/d)

Fabrication Period

(month)

Area

(Acre)

Skid Number

Weight

(Ton)

MR2

200

75

4

1

4

50

MR5

500

100

4

1

4

80

 

Equipment for Mini Oil Refinery

Equipment for 500 bpd refinery

Quantity

Capacity

Units

Description

1

500

bpd

Crude Distillation Unit(CDU)

1

500

bpd

De-Salter

A gas plant will also be needed to capture and separate the gas products from the CDU but was not sized, nor priced. Upon completion of the oil refinery design, the size and oil refinery construction cost will be determined. Air Cooling is used in lieu of water cooling. Heat transfer oil and hot products are used in lieu of steam for reboiling and stripping. If client requests the use of cooling water and steam, the daily requirement will be provided with Schedule A process engineering design. Any changes by Client to feedstock and/or product slate will require the generation of a new technical proposal based upon updated feedstock or product slate. An actual feedstock assay will be required prior to commencement of construction.

Scope of Supply of Mini Oil Refinery

The Process Design Package shall consist of the process equipment that will include preliminary and final engineering/design; a petroleum refinery with necessary equipment; one-year supply of spare parts and a documentation package that can be used to apply for permits and for operations. 

We have used oil refinery for sale, if you want to know the mini crude price or mini crude oil refinery capital cost, please contact us.

PCC was established in 1993, and it’s a state owned company by Tianjin University which is ranking No.1 in chemical oil refinery engineering in China. PCC has a factory size of 145,064m2 and currently employs more than 350 people with various responsibilities in design and R&D, project management, engineering, procurement, and construction. A significant number of personnel also handle the commercial, financial, IT and administration of the Company. Read More

 8466765471?profile=original

Read more…

Hydroskimming Refinery

Catalog of Hydroskimming Oil bpd Refinery

Mode

Capacity

(BPD)

Power

(Kw/d)

Fabrication Period

(month)

Area

(Acre)

Skid Number

Weight

(Ton)

MR150

15000

500

7

4

12

550

MR200

20000

650

7

5

14

700

MR250

25000

800

7

6

16

900

 

20,000 bpd   Hydrskimming Refinery

Generic Crude Oil Assay with API of 33.9°- CDU Yield

Product

Yield

20,000

bpd

Light Gasoline

2.63%

526

bpd

Light Naphtha

4.05%

810

bpd

Medium Naphtha

9.14%

1828

bpd

Heavy Naphtha

6.70%

1340

bpd

Light Kerosene

9.90%

1980

bpd

Heavy Kerosene

12.79%

2558

bpd

AGO

15.47%

3094

bpd

Atmos Residue

37.92%

7584

bpd

Total

100.00%

20,000

bpd

 

Know How and Technology of Hydroskimming Refinery

The modular oil refinery's core technology is based on the up to date internal technology from PCC. As we know internal's efficiency influence the unit size and energy consumption. We are the member of FRI(which is non-profit organization founded by most esteemed chemical company like Exxon Mobil, Shell, Dow, etc. And the most authoritative research group in internal field). Our newest patent packing Winpak is widely used in the oil and gas field and win very good reputation from our customers.

Jet guided trapezoidal floating valve(SGTV)

SGTV is high-performance float valve tray, researched and developed by Tianjin University, on the basis of absorbing the application of bar float valve, fixed tongue and guided sieve tray experience from domestic and overseas. (Patent no. 00204491.9). The valve plate shape is divided into two kinds of models A and B, absorbed the characteristics of the V type grid, changing the rectangular valve plate to trapezoid, making propelling action strengthened. Especially the B type float valve, not only opens holes on the side of the type A float valve, but also adds a hole in front of the body, plays a guide role in real, at the same time, strengthens the propelling action. On the structure, using gas circulation area adjustable floating valve structure overcomes the small operation flexibility of V- grid. Experimental research and practical application show that the SGTV greatly improves the performance of the plate.

Winpak packing

Through continuous improvement of traditional packing, PCC has a series of new high efficiency structured packings with independent intellectual property rights, the main product is Winpak series packing. Compared to the conventional plate corrugated packing with same surface area, our packing’s plate efficiency improves more than 25-50%, while pressure drop decreases. New packing has been applied in hundreds of towers in oil refining, petrochemical and other industries.

PCC was established in 1993, and it’s a state owned company by Tianjin University which is ranking No.1 in chemical refinery engineering in China. PCC has a factory size of 145,064m2 and currently employs more than 350 people with various responsibilities in design and R&D, project management, engineering, procurement, and construction. A significant number of personnel also handle the commercial, financial, IT and administration of the Company. Read More

 8466765863?profile=original

Read more…

MODULAR REFINERY

PCC's Modular Refineries are designed and fabricated in our manufacturing base located in Tianjin, China. As the name implies, all equipment is constructed in modules that are designed to be transported quickly and easily anywhere in the world.

 

Depending on the refining capacity, Modular Refineries can be designed and constructed with the major part of the work accomplished in our factory in a controlled atmosphere. This greatly improves efficiency and keeps costs low. We do as much of the work in our factory as possible, controlling man hours and material costs through the immediate access afforded by our on-site engineering and design facilities. The costs mainly include cost of building a small oil refinery, cost of oil refinery plant and refinery cost. So we have to work out how much does an oil refinery cost. Then make further arrangements.

 

For the largest Modular Refineries some components (such as crude distillation columns) are too large to mount on skids and must be shipped separately. Before shipping and while still in our factory, we preassemble all of these components directly to the modularized process systems so field assembly is short and efficient.

 

PCC was established in 1993, and it’s a state owned company by Tianjin University which is ranking No.1 in chemical oil refinery engineering in China. PCC has a factory size of 145,064m2 and currently employs more than 350 people with various responsibilities in design and R&D, project management, engineering, procurement, and construction. A significant number of personnel also handle the commercial, financial, IT and administration of the Company. Read More

 8466764691?profile=original

Read more…

LPG Plant

Application of LPG Plant

 

This lpg skid unit is applicable to wellhead associated gas pretreatment, including dehydration, hydrocarbon recovery, compression, storage transportation and pressure regulation project, meets the requirement of skid mounted vehicular design, manufacture, and simple, flexible loading and installation at the well site.

 

Process Routes and Solution of lpg gas plant 

According to the gas source and usages, we design to remove the heavy hydrocarbon in feed gas, produce LPG and stable light hydrocarbon, and make dry gas at the same time.

 

HSU -- Heavies Separation Unit

 

Heavies Separation Unit (HSU) is installed in conjunction with HRU. Once NGL has been removed from the natural gas stream, it must be fractioned into base components, which can be sold as C3 LPG and C4+ hydrocarbons products.

As the lpg recovery plant, if you want to know the detail lpg process, please contact us.

 

PCC was established in 1993, and it’s a state owned company by Tianjin University which is ranking No.1 in chemical oil refinery engineering in China. PCC has a factory size of 145,064m2 and currently employs more than 350 people with various responsibilities in design and R&D, project management, engineering, procurement, and construction. A significant number of personnel also handle the commercial, financial, IT and administration of the Company. Read More

 8466764888?profile=original

Read more…

LPG Plant

Application of LPG Plant

 

This unit is applicable to wellhead associated gas pretreatment, including dehydration, hydrocarbon recovery, compression, storage transportation and pressure regulation project, meets the requirement of skid mounted vehicular design, manufacture, and simple, flexible loading and installation at the well site.

 

Process Routes and Solution of lng liquefaction plant

According to the gas source and usages, we design to remove the heavy hydrocarbon in feed gas, produce LPG and stable light hydrocarbon, and make dry gas at the same time.

 

 

HSU -- Heavies Separation Unit

 

Heavies Separation Unit (HSU) is installed in conjunction with HRU. Once NGL has been removed from the natural gas stream, it must be fractioned into base components, which can be sold as C3 LPG and C4+ hydrocarbons products. If you want to know the detail lng plant process, please contact us.

 

PCC was established in 1993, and it’s a state owned company by Tianjin University which is ranking No.1 in chemical refinery engineering in China. PCC has a factory size of 145,064m2 and currently employs more than 350 people with various responsibilities in design and R&D, project management, engineering, procurement, and construction. A significant number of personnel also handle the commercial, financial, IT and administration of the Company. Read More

 8466765089?profile=original

Read more…

CNG Plant

CNG production process Unit

Rich methane gas meets with rich gas ethane reheated by cooling heat exchanger, this steam of gas flows through the CNG compressor to increase pressure to 25Mpag, CNG process can be obtained.

 

The compressor skid adopts motor drive, and an ASPRO piston dynamic balance less oil lubrication type compressor. The drive is completely explosion-proof motor, its security level is class 1. Motor is connected to the compressor by belt wheel, and by aligns laser alignment instrument. Natural gas is cooled by the interstage air coolers. Gas collected by the downtime interstage gas collecting device will directly enters to the compressor's input pore at the next start. What’s more, there’re interstage liquid-gas separators and last stage gas scrubbing device. At compressor downtime, these devices will bring the impurities within the system to the recovery tank by gas flow. All the automatic valve drive is driven by the natural gas in the recovery tank, an external air compressor is unnecessary. The whole compressor system is installed on a steel structure, the control panel is at the side.

The pressurized CNG is filled to gas tanker by gas filling column.

As the famous cng plant, if you have any question, please contact us.

 

PCC was established in 1993, and it’s a state owned company by Tianjin University which is ranking No.1 in chemical oil refinery engineering in China. PCC has a factory size of 145,064m2 and currently employs more than 350 people with various responsibilities in design and R&D, project management, engineering, procurement, and construction. A significant number of personnel also handle the commercial, financial, IT and administration of the Company. Read More

 8466765296?profile=original

Read more…

MODULAR GAS PROCESSING

PCC has proven track record of providing comprehensive gas utilization solutions for onshore and offshore projects. Such solutions often ensure the implementation of innovative technologies packaged with global project management and execution expertise.

 

A natural gas processing plant is required for most gas streams that are produced from a gas well or an associated oil well. Natural gas in its raw form can contain water, NGL (Natural Gas Liquids), CO2 and H2S.

 

The natural gas from well heads usually requires processing to remove these contaminates from the gas stream. Gas streams from refinery or other processes require gas processing as well to remove liquids and condition the gas stream for its optimum purpose.

If you want to find the best natural gas processing plant design, please contact us.

 

PCC was established in 1993, and it’s a state owned company by Tianjin University which is ranking No.1 in chemical refinery engineering in China. PCC has a factory size of 145,064m2 and currently employs more than 350 people with various responsibilities in design and R&D, project management, engineering, procurement, and construction. A significant number of personnel also handle the commercial, financial, IT and administration of the Company. Read More

 8466765076?profile=original

Read more…